What's New

New features in WorkZone Process 2022.0

Process deadline column in Task lists

The Process deadline column can now be displayed in the following task lists in dashboards:

  • My open tasks
  • My open and pending tasks
  • My unit's open tasks
  • My pending tasks
  • My unit's pending tasks

The Process deadline column can also be displayed in task lists in WorkZone Process Overview.

Note: The Process deadline column is not displayed by default and must be manually added to the displayed columns by the user.

Increased flexibility in Advanced Submissions

Users now have an increased flexibility when working with Advanced submissions. At any time during the Advanced submission process, users can for parallel or sequential steps:

  • Add new actors to an active or pending step
  • Remove existing actors from an active or pending step
  • Reorder the sequence of actors within an active or pending step by using the mouse (drag-and-drop operations)
  • Add new steps to the current submission
  • Rename any step in the current submission
  • Remove any pending steps in the current submission.
  • Reorder any step in the submission by using the mouse (drag-and-drop operations). Other steps cannot be placed before the initial step 1, however the initial step 1 can be removed. Once the initial step 1 has been removed, you can freely re-order any step, including the current first step.

When a step or actor is edited, user and task lists are automatically updated. Tasks that are no longer relevant are displayed as obsolete in the Process log. Affected users will also be notified of the changes unless notification settings in WorkZone have been configured to suppress notifications.

New document filter in Advanced submissions

A new document filter called Documents in hierarchy has been introduced to the Advanced submissions form. With the new filter, users can add any document that is attached to any sub-case within the case hierarchy of the main case of the submission. All documents in the case hierarchy (parent as well as child cases) will be displayed in the list and can be selected.

Update task deadlines

The deadline of an active or pending step can be updated or removed. Assigning deadlines that occur in the past or that occur before the previous step's deadlines is not possible. Likewise, assigning a process deadline that occurs before any deadline defined on the individual process steps is not possible.

If the deadline for a task is removed, the process deadline will be applied instead. If there is no process deadline, the task deadline will empty.

Note: Updates to the advanced submissions process are applied to the current process only. If the process is re-started, the values of the original advanced submission will be applied instead of any updates made by users during the first run of the process.

Adding the same actor to a parallel step

When adding an actor to a parallel step, it is only possible to add the actor once. Once the actor is added, the list of possible actors will no longer contain the actor. On a sequential step, the same actor can be added as many times as required.

Forwarding a task on a parallel step

When forwarding a task on a parallel step to another actor, actors with active tasks in the step will not be displayed in the list of potential actors .